A) Supply Of Traction Engine And Electrics Kit For Detc As Per Plw Sor Doc N O. Plw Detc/30906313 Rev-5 Of Aug-2025 & Rdso Specification No. Ti/Spc/Ohe/8Wdetc/0092 R Ev.-2 Of August 2015. B) Installation Of All Items Covered At Item- (A) Above As Per Releva Nt Drawings And Detailed Scope Of Work As Per Doc No Plw/Detc/30906313/Tr. Electrics I Nstallation & Furnishing R-2 Of March-26. C) Final Assembly And Testing Of 8W-Detc Bogie S As Per Sor Doc No. Plw/Detc/Bogie-Assy Rev.-1 Of Aug-25. D) Installation Of Air Brake Eq Uipment In 8W-Detc Shell As Per Sor Doc No. Plw/Detc/Air Brake-Installtion Rev.-2 Of Aug -25. E) Testing And Commissioning Of Above Equipment In Plw As Per Plw Sor Doc No Plw D Etc/30906313 Rev-5 Of Aug-2025 & Rdso Specification No. Ti/Spc/Ohe/8Wdetc/0092 Rev.-2 Of August 2015. F) Final Commissioining Of Detc At The Holding Depot On Zonal Railways As P Er Rdso Specification No. Ti/Spc/Ohe/8Wdetc/0092 Rev.-2 Of August 2015. [ Warranty Period : 36 Months After The Date Of Delivery ] ]