Technical Assistance And Monitoring Of The Works Envisaged Within The Framework Of Contract N°01/2026, Ao N° 01/2026 Of 04/28/2026 Consist Of The Construction Of The Following 3 Tracks: • The Llala Hlima Road From The Regional Road 411 Towards El Bouzidi Over A Length Of 3,194Km • The Shayel Road From Sidi Abed Erazak Towards The Ait Hmou School Idir Over A Length Of 2,539Km • The Oueld Naaneaait Hmou Idir Road Towards The Regional Road Sidi Abed Erazak Over A Length Of 1.5 Km Whose Total Length Is Approximately: 7,233 Km. On Behalf Of The Commune Mkam Tolba