Construction Of Rcc Retaining Wall At Backside, Left And Right Side And External Development Including 6.00 Metre Wide Cement Concrete Road Around The Building, One Side Drive Way 3.60 M Wide At Front Side From Porch, Front Compound Wall, Ms Entrance Gate Etc. And Cutting And Dressing Of Soil / Unstable Rock Behind Proposed Rcc Retaining Wall At Backside Of The Laxmibai Kelkar Girls Hostel At Mgahv Wardha. Sh :- Carrying Out Geotechnical Investigation Subwork/Packages:Soil Investigation