Supply & Carrying Out Maintenance Schedule Ssii (36 Month) Of Single Leaf Pl Ug Door (Make-Faiveley) In One Bu (16 Doors) Of Vb Train Set Rake. Work Shall Include: 1. Maintenance Activities To Be Performed, 2. Replacement Of Must Change Items I.Skf Greas E Ref; Lgep 2Ii. Adhesive Loctite 24 Iii. Any Other Must Change Item Required And 3. Replace Ment Of Condition Based Items On Need Basis. [ Warranty Period: 30 Months After The Date Of Delivery ] ]