Set Of Side Walls Assembly And Roof Complete (Without Primer) For Lhb Ac 3 Tier Coach To Planning Set List Number: Mp20Rseaccn Version 6 & Mdts 21323 Rev. 02, Mdt S 21327 Rev 01 Dated: 09.06.2020 & Mdts102 Rev. 03 Dated 20.03.2020 (Without Primer) Note: (1) All Loose Items Are To Be Packed In Separate Packing Along With Set. (2) Packing To Be Done As Per Pi042 & Pi176. [ Warranty Period: 96 Months After The Date Of Delivery ] ]